Chimney Installation Platform
Contact Info
- Add:盐都区解放南路266号凤凰汇聚龙中心8楼806室, Zip: 224055
- Contact: 黄经理
- Tel:18905119703
- Email:2644631772@qq.com
Other Products
Chimney Installation Platform (Chimney Installation Platform Company,Chimney Installation Platform Construction)
Business Scope:
1. Undertake the construction, installation, reinforcement, demolition, and heightening of various chimneys and water towers (brick, concrete, steel structure); concrete shell slip-form reinforcement; tilt correction; replacement of inner linings; cleaning and dust removal; painting aviation warning color rings; replacement and reinforcement of exposed metal components such as ladders, platforms, protective nets, lightning rods, and anti-corrosion painting maintenance.
2. Cleaning, repair, anti-corrosion, waterproofing, and moisture-proof leak sealing for the inner and outer walls of chimneys, cooling towers, water towers, urea granulation towers, detoxification towers, and silos.
3. Surface treatment and specialized anti-corrosion for metal structures such as TV towers, transmission towers, microwave towers, substation frameworks, bridges, various gantry cranes, steel beam roof trusses, gas tanks, (oil, acid, alkali, solvent) storage tanks, and chemical equipment.
4. Cleaning, washing, repair, decoration, coating, and high-temperature resistant fireproof coating for the exterior walls of high-rise buildings, skyscrapers, factories, and coal conveyor trestles.
5. Flooring Engineering
Undertake various terrazzo floors, epoxy, wear-resistant, hardened, dust-free, colored, anti-static, and metal (emery) cement-based wear-resistant floors; non-slip vibration-free driveways and colored stamped concrete floors; repair, cleaning, and waxing maintenance for various industrial floors.
6. Underwater Salvage
Engage in the construction of river, sea, and port terminals; dockyards, shipways, slipways, ship locks, navigation lift equipment, channel dredging, land reclamation, port area storage yards, embankment revetments, underwater blasting and clearing of reefs, and corresponding projects such as silos, underwater foundations and bases, earthwork, navigation markers, trestles, coastal and offshore hydraulic engineering, installation of port loading and unloading equipment, installation of navigation structure equipment, underwater excavation, heavy lifting, inland river salvage and obstacle clearance.
7. Desulfurization and Anti-Corrosion
Coal used in thermal power plants contains sulfur, which produces sulfur dioxide during combustion, severely impacting the atmospheric environment after emission. Due to environmental pressures, flue gas desulfurization (FGD) has become the primary method for controlling sulfur dioxide emissions in thermal power plants. Therefore, FGD flue gas desulfurization units have become essential supporting projects in many power plants. Those previously built without such units are now also installing flue gas desulfurization systems. Wet desulfurization anti-corrosion for the inner linings of thermal power plant chimneys, absorption towers, and flue ducts, using acid-resistant borosilicate foam glass brick linings, vitrified ceramic tiles, glass flake anti-corrosion, spray polyurea, OM coatings, and acid-resistant mastic for anti-corrosion; repair of cracks and leaks in chimneys and flue ducts.
| Industry Category | 家用电器 |
|---|---|
| Product Category | |
| Brand: | 广前 |
| Spec: | GQJS |
| Stock: | 88888 |
| Manufacturer: | |
| Origin: | China / Jiangsu / Yanchengshi |